top of page

TRAFFIC ANALYSIS

ITD is studying the I-90 corridor from SH-41 to 15th Street to identify improvements to modernize the roadway system. With the recommended improvements, ITD will meet the demands of 2045 traffic volumes, maintain travel times and reduce crashes.


Average daily traffic (volume) is expected to double by 2045.

ITD_map_US 90 LOS 41-15th_With Blue line copy.png
Traffic analysis of I-90 from SH-41 to 15th Street in Coeur d’Alene, showing existing and anticipated levels of service and average daily traffic

Open PDF to see detailed view of the traffic analysis

Icon PDF Traffic analysis.jpg
bottom of page