WIDENING DESIGN

The five miles of I-90 from SH-41 to US-95 is the most heavily traveled and congested in the corridor. This section is the first project to be advanced from the study into design. Construction is anticipated to start in summer 2024. Interchange replacements and reconfigurations will occur with future projects.  

Improvements 
  • Add two lanes in each direction, for a total of four lanes eastbound and four lanes westbound

  • Replace and widen bridges over Huetter Road, Atlas Road and Prairie Trail 

  • Realign impacted  sections of Prairie Trail and Centennial Trail

  • Lengthen existing interchange on- and off-ramps to allow for safer merging with I-90 mainline traffic

Photo of I-90 near the Prairie Trail and Centennial Trail intersection

Open PDF to see I-90 widening design